Speed reducer use skills
Release time:
2021-11-09
After 200 to 300 hours of operation, the oil should be changed. In the future, the quality of the oil should be checked regularly. The oil mixed with impurities or deteriorated should be replaced in time. In general, for the long-term continuous work of the reducer, according to the operation of 5000 hours or once a year to replace the new oil, long-term suspension of the reducer, before re-operation should also be replaced with new oil. Reducer should be added with the original brand of the same oil, not mixed with different brands of oil, the same brand and different viscosity of oil to allow mixed use;
1. After running for 200 to 300 hours, the oil should be changed. The quality of the oil should be checked regularly in future use. The oil mixed with impurities or deteriorated should be replaced in time. In general, for the long-term continuous work of the reducer, according to the operation of 5000 hours or once a year to replace the new oil, long-term suspension of the reducer, before re-operation should also be replaced with new oil. Reducer should be added with the original brand of the same oil, not mixed with different brands of oil, the same brand and different viscosity of oil to allow mixed use;
2. When changing the oil, wait for the reducer to cool down and there is no danger of burning, but it should still be kept warm, because after complete cooling, the viscosity of the oil increases and it is difficult to drain the oil. Note: cut off the power supply of the transmission device to prevent unintentional power supply;
3. During work, when it is found that the oil temperature rises more than 80 ℃ or the oil pool temperature exceeds 100 ℃ and abnormal noise is generated, the use should be stopped, the cause should be checked, the fault should be eliminated, and the lubricating oil should be replaced before it can continue to operate;
4, the user should have reasonable use and maintenance rules and regulations, the operation of the reducer and the problems found in the inspection should be carefully recorded, the above provisions should be strictly implemented.
Related News
Focus on us
Website QR code
Jiangsu Lidun Heavy Industry Co., Ltd.
Address: No. 18 Zhong'an Road, Entrepreneurship Incubation Zone, Yaowang Street, Taixing City
Contact person: Mr. Li
Mobile phone:18852641111
E-mail:18852641111@qq.com